ITEN

Subaugusta Station

Line A · Rome Metro

line
No
interchange
1980
in service since

Subaugusta — overview

Subaugusta station — Rome underground

The entrances to Subaugusta are at the junction of via Tuscolana and piazza di Cinecittà. The name comes from an old road in the area. It is a stop from the first section of 16 February 1980, serving the residential district around the film studios.

First and last train from this station

DirectionFirst trainLast trainEvery
Monday–Thursday
AAnagnina6:06 AM12:06 AM3–6 min
ABattistini5:34 AM11:34 PM3–6 min
Friday
AAnagnina6:06 AM2:06 AM3–7 min
ABattistini5:34 AM1:34 AM3–8 min
Saturday
AAnagnina6:06 AM2:06 AM3–6 min
ABattistini5:34 AM1:34 AM3–5 min
Sunday
AAnagnina6:07 AM12:07 AM4–7 min
ABattistini5:34 AM11:34 PM4–7 min

Departure times from this stop, not from the terminals. When the metro closes, the nMA night buses take over.

What's nearby

Piazza di Cinecittà and via Tuscolana, a residential district that grew around the film studios, with the shopping centre and local markets.

Connections and interchanges

Surface routes within 250 m (12)
213451520548557558559590789C11T02T20
Night routes
n500nMA

Routes stopping within 250 metres of the entrances. Some run at weekends only.

Station facilities

Ticket machines

Lifts and escalators can be out of service: current status is on the ATAC app.

Facilities from public sources · times, frequencies, surface routes and journey times from Atac's official GTFS, August 2026 edition

Nearby stops and journey times

How long it takes from here
Termini
Termini station, trains and airport buses
18 min
direct, 13 stops
Colosseo
Colosseum, Roman Forum and Palatine
23 min
12 stops, change at San Giovanni
Ottaviano
Vatican Museums and St Peter's
27 min
direct, 19 stops
Spagna
Spanish Steps and Trevi Fountain
22 min
direct, 16 stops
Piramide
Ostiense and trains to Ostia
29 min
17 stops, change at Termini
San Giovanni
Basilica of St John Lateran
14 min
direct, 10 stops

In-vehicle times, plus 4 minutes for each change; they do not include waiting on the platform.

All stops on the A →

Frequently asked questions

Subaugusta entered service on 16 February 1980. It is part of the A line of the Rome metro, run by Atac.

Subaugusta is served by the A line. See the line page for the full list of stops.

The documented facilities at Subaugusta are: ticket machines. Lift and escalator availability can change: check the ATAC app before you travel.

From Subaugusta the first train leaves towards Anagnina at 6:06 AM; towards Battistini at 5:34 AM. The last one leaves around 11:34 PM Sunday to Thursday and at 2:06 AM on Friday and Saturday. At the morning peak a train runs about every 3 minutes. When the metro closes, the nMA night bus takes over.

14 surface routes stop within 250 metres of Subaugusta: 213, 451, 520, 548, 557, 558, 559, 590, 789, C11, T02, T20, n500, nMA. Routes change over time, so check them on the Atac app before you travel.

Index

ITEN