Battistini Station
Line A · Rome Metro
Battistini — overview

Battistini is the north-western terminus of Line A, opened on 1 January 2000 at the end of a 4.5 km extension that had begun about a decade earlier. The station is underground, with both tracks on the same level, and serves the Primavalle-Torrevecchia district. It is an important interchange for anyone arriving from the north-west: surface routes leave from here towards Boccea, Casalotti and the towns along the via Aurelia.
First and last train from this station
| Direction | First train | Last train | Every |
|---|---|---|---|
| Monday–Thursday | |||
| AAnagnina | 5:30 AM | 11:30 PM | 3–6 min |
| Friday | |||
| AAnagnina | 5:30 AM | 1:30 AM | 3–7 min |
| Saturday | |||
| AAnagnina | 5:30 AM | 1:30 AM | 3–6 min |
| Sunday | |||
| AAnagnina | 5:30 AM | 11:30 PM | 4–7 min |
Departure times from this stop, not from the terminals. When the metro closes, the nMA night buses take over.
What's nearby
The residential Primavalle-Torrevecchia district, with the Pineto park nearby and the bus terminus for the north-western quadrant. An area of 1950s public housing and street markets.
Connections and interchanges
Routes stopping within 250 metres of the entrances. Some run at weekends only.
Station facilities
Lifts and escalators can be out of service: current status is on the ATAC app.
Facilities from public sources · times, frequencies, surface routes and journey times from Atac's official GTFS, August 2026 edition
Nearby stops and journey times
| Termini Termini station, trains and airport buses | 18 min direct, 11 stops |
| Colosseo Colosseum, Roman Forum and Palatine | 25 min 13 stops, change at Termini |
| Ottaviano Vatican Museums and St Peter's | 9 min direct, 5 stops |
| Spagna Spanish Steps and Trevi Fountain | 14 min direct, 8 stops |
| Piramide Ostiense and trains to Ostia | 29 min 15 stops, change at Termini |
| San Giovanni Basilica of St John Lateran | 23 min direct, 14 stops |
In-vehicle times, plus 4 minutes for each change; they do not include waiting on the platform.
Frequently asked questions
Battistini entered service on 1 January 2000. It is part of the A line of the Rome metro, run by Atac.
Battistini is served by the A line. See the line page for the full list of stops.
The documented facilities at Battistini are: ticket machines, staffed ticket desk, toilets. Lift and escalator availability can change: check the ATAC app before you travel.
From Battistini the first train leaves towards Anagnina at 5:30 AM. The last one leaves around 11:30 PM Sunday to Thursday and at 1:30 AM on Friday and Saturday. At the morning peak a train runs about every 3 minutes. When the metro closes, the nMA night bus takes over.
8 surface routes stop within 250 metres of Battistini: 46, 46B, 91, 916, 916F, 983, n46, nMA. Routes change over time, so check them on the Atac app before you travel.