Graniti Station
Line C · Rome Metro
Graniti — overview

Graniti began as a stop on the Rome–Fiuggi railway, closed on 7 July 2008 for the conversion of the final stretch of the Rome–Pantano line, and reopened as a Line C station on 9 November 2014. Beside it lies the Graniti depot and workshop, home to the line's entire fleet: this is where the automated trains come out and go back in every day.
First and last train from this station
| Direction | First train | Last train | Every |
|---|---|---|---|
| Monday–Thursday | |||
| CColosseo/Fori Imperiali | 5:31 AM | 11:31 PM | 5–12 min |
| CPantano | 6:06 AM | 12:06 AM | 5–12 min |
| Friday | |||
| CColosseo/Fori Imperiali | 5:31 AM | 1:31 AM | 5–13 min |
| CPantano | 6:06 AM | 2:06 AM | 5–12 min |
| Saturday | |||
| CColosseo/Fori Imperiali | 5:31 AM | 1:31 AM | 5–13 min |
| CPantano | 6:06 AM | 2:06 AM | 5–12 min |
| Sunday | |||
| CColosseo/Fori Imperiali | 5:31 AM | 11:31 PM | 5–12 min |
| CPantano | 6:06 AM | 12:06 AM | 5–12 min |
Departure times from this stop, not from the terminals. When the metro closes, the nMC night buses take over.
What's nearby
The Line C depot and workshop, home to all the automated trains, and the residential Finocchio-Borghesiana area.
Connections and interchanges
Routes stopping within 250 metres of the entrances. Some run at weekends only.
Station facilities
Lifts and escalators can be out of service: current status is on the ATAC app.
Facilities from public sources · times, frequencies, surface routes and journey times from Atac's official GTFS, August 2026 edition
Nearby stops and journey times
| Termini Termini station, trains and airport buses | 40 min 23 stops, change at San Giovanni |
| Colosseo Colosseum, Roman Forum and Palatine | 37 min direct, 22 stops |
| Ottaviano Vatican Museums and St Peter's | 49 min 29 stops, change at San Giovanni |
| Spagna Spanish Steps and Trevi Fountain | 44 min 26 stops, change at San Giovanni |
| Piramide Ostiense and trains to Ostia | 45 min 24 stops, change at Colosseo |
| San Giovanni Basilica of St John Lateran | 32 min direct, 20 stops |
In-vehicle times, plus 4 minutes for each change; they do not include waiting on the platform.
Frequently asked questions
Graniti entered service on 9 November 2014. It is part of the C line of the Rome metro, run by Atac.
Graniti is served by the C line. See the line page for the full list of stops.
The documented facilities at Graniti are: ticket machines, toilets. Lift and escalator availability can change: check the ATAC app before you travel.
From Graniti the first train leaves towards Colosseo/Fori Imperiali at 5:31 AM; towards Pantano at 6:06 AM. The last one leaves around 11:31 PM Sunday to Thursday and at 2:06 AM on Friday and Saturday. At the morning peak a train runs about every 9 minutes. When the metro closes, the nMC night bus takes over.
4 surface routes stop within 250 metres of Graniti: 052, 055, 555, nMC. Routes change over time, so check them on the Atac app before you travel.